Book a FREE Site Visit Today & See How We Can Work Together.

DCU Dublin

Plumbing

Client

Dublin City University

Project Scope

The works comprise the removal of the existing hot water system and its replacement with two hot water generator buffer tanks, with the objective of improving water quality, system efficiency, and overall reliability of the hot water supply.

Project Outcome

On completion of the works, the existing hot water system was fully removed and replaced with two hot water generator buffer tanks, delivering a modern, efficient, and reliable hot water solution.

The upgraded system will:

  • Significantly improve hot water quality through better temperature control and reduced water stagnation.

  • Increase overall system efficiency, reducing heat loss and improving energy performance.

  • Provide a more stable and consistent hot water supply capable of meeting peak demand.

  • Support compliance with current water hygiene, health & safety, and building standards.

  • Reduce ongoing maintenance requirements and improve long-term system reliability.

Overall, the project will result in a future-proofed hot water system that enhances operational performance, supports good water hygiene practice, and delivers improved efficiency and occupant comfort.

Project Gallery

Bann Mechanical Ltd provides a full range of commercial plumbing, heating and ventilation services across Northern Ireland.

Our Services
Get in Touch

22b High Street, 

Portadown

BT62 1HZ

Email: info@bannmech.com

© Copyright 2026 Bann Mechanical Ltd  All Rights Reserved